2 UNITS IN THE FIELD · LIVEINLAND NORTHWEST

Power where
there isn't any.

Weeks unattended. Wi-Fi included. One box, delivered.

IDAHO · EASTERN WASHINGTON · WESTERN MONTANA

HONEST ENVELOPE
4 kW
SURGE
2 kW
FOR ~42 MIN
1.6 kW
INDEFINITE
Sitepulse field unit deployed on a remote site
UNIT · 00247.6721° N · 116.7799° W
SOC
87%
LOAD
142 W
FUEL
11.2 gal
UPTIME
18 d
DUST MONITORSRTK BASE STATIONSWATER QUALITY SONDESSCADAREPEATERSDRONE DOCKSSITE CAMERASPLC CABINETSPRIVATE LTEWEATHER STATIONSDUST MONITORSRTK BASE STATIONSWATER QUALITY SONDESSCADAREPEATERSDRONE DOCKSSITE CAMERASPLC CABINETSPRIVATE LTEWEATHER STATIONS
02 / COMPARISON

If you need power somewhere there isn't any,
you've got four bad choices.

Trench, solar, generator, or go without. Here's what each of them actually looks like when the job is to keep a small instrument alive for a month with nobody driving out.

Trench in grid
Solar + battery
Generator
Go without
Sitepulse
Time to live
Months
Days – weeks
Hours
—
Same week
Winter
Fine
Browns out
Fine
—
Fine
Noise
Silent
Silent
Constant
—
Silent ~90%
Refuel / service
None
Battery swaps
Weekly truck roll
—
Scheduled off telemetry
Footprint
Trench + permits
1,000 W of panel
Trailer
—
90 lb box
You find out it’s down
—
When data stops
When data stops
Always
Before it happens

Met One's own manual says powering a single 50-watt dust monitor off-grid takes 290–1,010 W of solar panel plus seven 110 Ah batteries — and North Idaho in December is the 1,010 W end.

SOURCE / MET ONE E-BAM OPERATING MANUAL
03 / SIZE YOUR SITE

The two numbers
that sort you in ten seconds.

Watts and days. Pick what you're running, tell me how long between visits, and I'll tell you honestly whether this is the right tool — or whether you want a towable genset.

STEP 03 OF 3
01
What are you running?
Datalogger (Campbell CR1000X class)
1 W
0
Water quality sonde (YSI EXO2 class)
2 W
0
Automated water sampler (ISCO 6712)
1 W
0
RTK GPS base station (Trimble R750)
continuous
6 W
0
Weather station
5 W
0
Cellular / LoRa gateway
8 W
0
Portable dust monitor (Met One E-BAM)
continuous
50 W
1
Starlink Mini
30 W
1
Starlink Standard
65 W
0
IP security camera
each
25 W
1
PLC / control cabinet
40 W
0
Radio repeater
60 W
0
Continuous BAM w/ inlet heater (BAM 1022)
⚠ heavy
299 W
0
LED work light
100 W
4 h/d
0
Tool / battery charging
200 W
2 h/d
0
Transfer pump
400 W
0.5 h/d
0
CUSTOM LOAD
WATTS
HOURS / DAY
02
How long between site visits?
03
When, where, and how big a tank?
SEASON
ZIP / SITE
FUEL TANK
VERDICT
Good fit

Comfortable. Expect a service visit about every 25 days — whichever hits first.

UNITS
1× box
SILENT STRETCH
11.1h
ENGINE / DAY
2.0h
FUEL / MONTH
17.6gal
AIR FILTER
24.8d
BINDING CONSTRAINT
TANK LASTS
25.9d
AVG LOAD · PEAK · TOTAL
125 W avg · 105 W peak
MONTHLY
$900/mo
UNIT ENVELOPE (PER BOX)
4 kW surge · 2 kW ~42 min · 1.6 kW indef.
Reserve this configuration →
04 / ADD-ONS

Priced in dollars and watts.

Every add-on eats into the same daily energy budget as your instruments. We show the cost in both currencies. If a percent is highlighted, that's the one you should think twice about.

Add-on
Draw
Share of daily budget
Monthly
App-controlled outlets + alerts
Pure margin. Zero watts. Start here.
0 W
none
$49
Site camera + event recording
24/7 IP camera with edge storage
25 W
16%
$99
LED work lighting
4 h/day duty cycle
~17 W avg
10%
$39
Weather / environmental sensors
Temp · humidity · barometric · wind
5 W
3%
$79
Water filtration (creek/well/tank)
SHURflo pump + Viqua UV. Filtration only.
26–82 W intermittent + 17 W
1–3%
$149
Freeze protection (heat trace + tank pad)
Binding winter constraint. Spec it before filtration.
100 W winter
⚠ 63%
$99
Second unit — runtime + redundancy
N+1. Not "4 kW." Two 2 kW islands. If one fails the site stays up.
—
doubles silent
$900
DROPPED — AND WHY

Atmospheric water generation

Best-case energy intensity is 0.3 kWh per litre. One gallon a day is a third of the entire budget. In a North Idaho winter it doesn't degrade — it stops: at 5 °C / 40 % RH the dew point is −7.5 °C and the coil makes frost, not water.

SOURCE / EPA LCA · WATERGEN + ECOLOBLUE
KEPT — AND WHY

Filtration from an existing source

A SHURflo pump at 26–82 W intermittent plus a Viqua UV at 17 W is 0.02–0.4 kWh/day — one to three percent of budget. Spec heat trace beforefiltration; it's the binding constraint in winter.

CREEK · WELL · TANK
05 / COVERAGE

A three-hour delivered radius.

Everything inside is full-service — we deliver, install, monitor, and refuel. Everything outside is customer pickup or freight, priced separately.

TIER 1 · FULL-SERVICE
IDAHOEASTERN WASHINGTONWESTERN MONTANA
TIER 2 · PICKUP OR FREIGHT
CENTRAL WASOUTHERN IDAHOCENTRAL MT
FROM COEUR D'ALENE, ID
Spokane40 minTIER 1
Silver Valley (Kellogg / Wallace)45 minTIER 1
Sandpoint / Bonners Ferry1.5 hTIER 1
Lewiston / Clarkston1.75 hTIER 1
Missoula2.5 hTIER 1
Tri-Cities3.5 hTIER 2
Boise7.5 hPICKUP
ID · WA · MT
SERVICE MAP
SPOKANESILVER VALLEYSANDPOINTLEWISTONMISSOULATRI-CITIESCOEUR D'ALENEHQ
3H RADIUS · FULL SERVICE
TIER 2 · PICKUP

We don't cover Oregon. The parts of Oregon that need this are 8–9 hours away across the Cascades. Delivered service there would cost more than the box. If you're on that side, we can talk about freight — but it's not the same product.

06 / HOW IT WORKS

From your inquiry to retrieval.

01
CONFIGURE

Size your site.

Use the calculator, get a verdict, save the config. Or just call — you tell me watts and days.

02
RESERVE

$250 holds a unit.

Deposit is fully credited to month one. Refundable if we can’t make the site work.

03
SITE CALL

We walk the site.

Access, siting, refuel plan, safety briefing. If you’re on a GC site, NRTL package lands before the call.

04
DEPLOY + WATCH

Delivery, then telemetry.

I drop the box, commission the load, hand you a dashboard login. Service is scheduled off telemetry, not a calendar.

07 / FAQ

The five questions you're about to ask.

Isn't that just a generator?
A generator runs constantly and is sized for your peak. This is a battery that carries the load silently, with a small engine that runs only to refill it. At 100 W the engine runs about two hours a day — the other twenty-two are silent. A Honda at that load is below quarter throttle: two or three refuels a day, forever, and it's slowly destroying itself. Caterpillar's own guidance says never run a genset under 30 % of nameplate.
Why not just add solar?
Because you size solar for December, not July. The industry standard for one 50 W instrument is 290 W of panel at good sun and 1,010 W at two peak-sun-hours — which is North Idaho in winter — plus seven 110 Ah batteries. That's a fixed installation with a footprint, and it still browns out in a smoke event or a snow week.
Is it UL listed?
Not yet. It's in NRTL field evaluation — quote and timeline are attached to every proposal. In the meantime here's the test-data package: insulation resistance, GFCI, overcurrent, thermal at sustained load, ingress rating, fuel containment, BMS fault behavior. Ask, and it lands in your inbox before your safety manager does.
What happens when it runs out of fuel?
It tells me before it does. Fuel level, engine hours, state of charge, and load are all on a dashboard — you get a login too. Service visits are scheduled off the telemetry, not off a calendar. That's the actual product: not the box, the fact that you don't have to think about the box.
Can you run my trailer's heat, a welder, or a saw all day?
No. Anything over about 2 kW sustained is outside what this does. Use the calculator above — it'll tell you straight. If part of your load is small and continuous (cameras, sensors, comms), we can cover that piece and leave the heavy stuff on a towable.
08 / RESERVE

$250 holds
your unit.

Credited fully to your first month. Every deployment needs a site conversation — access, siting, refuel plan, safety briefing — so the last step is a call, not a checkout.

CONFIGUREQUOTE$250 DEPOSITSITE CALLDELIVERY
WHAT WE'LL ASK ON THE CALL
  • · Site access — road, gate, terrain
  • · Who refuels, and how often you're on-site
  • · Whether you're on a GC-controlled worksite (flags NRTL early)
  • · Your COI / additional-insured requirements
  • · Target start date and expected duration
01
02
03
04
CONTACT + SITE

Who and where.

Company + site location. This is what we quote against.

COMPANY
YOUR NAME
EMAIL
SITE LOCATION / ACCESS NOTES